Home/ Services

Everything we prepare

Four documentation packages.
One job: first-time acceptance.

Whichever approval pathway your project is on, the bottleneck is the same — a certifier waiting on documents nobody has owned. We own them.

Pick your stage

Where is your project right now?

Also on the desk

The smaller pieces that
sit between the packages.

Not everything is a full package. Sometimes it's one document, one problem, or one decision.

4.55
When the design has moved

Section 4.55 modifications

Your drawings have drifted from the approved scheme and the certifier can't issue. We assess whether you're genuinely over the line and prepare the modification application if you are.

Often: the largest single delay on a project
CDC
Skipping the DA entirely

Complying Development Certificates

If your project meets the standards in the codes, a CDC combines planning approval and construction approval in one. Much faster — but only if you actually qualify, which is worth checking properly.

We prepare: the CDC documentation set
SOS
When it has already stopped

Stalled approval rescue

Certificate not coming, nobody sure why, and everyone pointing at someone else. We audit what has and hasn't been provided, get the true outstanding list in writing, and work it down.

Start with: a free assessment

How pricing works

Scoped from your conditions,
quoted before we start.

We don't publish a single price for any of these, because a three-condition project and a forty-condition project aren't the same job. What we do publish is the method: your free assessment produces a written document list, and the fixed-fee quote is built from that list. No hourly creep, and no work begins before you've accepted the scope.

Certifier fees, council fees, the long service levy, survey fees and consultant fees are separate and paid to those parties directly. We tell you which apply so nothing lands unexpectedly.

Not sure which one you need?

That's a completely normal place to start. Send the property address and whatever paperwork you have — we'll tell you which pathway you're on and what it requires.

Need something earlier than this?

Feasibility, duplex strategy and whether a site can be subdivided at all sit with our sister brand, Beaches Property Hub. We'll point you there rather than sell you a package you don't need yet.

Before you decide it can wait

What is the delay actually costing you?

Interest, rent, storage and holding costs keep running whether or not anything is happening on site. Move the sliders — the number updates as you go. Nothing is sent anywhere; it all runs in your browser.

Open the full calculator

Cost of the delay

$21,200

Every week it drags on $2,650

$1.2M
$1,150
8 weeks
Interest at 6.5% p.a.
Estimate only — not financial advice.
Full calculator →

Free assessment

Tell us where your project is.
We'll tell you what it needs.

One free review — whichever pathway you're on. A written list of every document your package requires, and an honest timeline. No obligation, no jargon left unexplained.

Get My Free Assessment

Or email hello@approvalhub.au with the property address — or call 0422 299 555